Skip to content
Wednesday, 25 November 2026 Festival calendar

Calculators

Days Between Two Dates: Day Count Calculator

Count the days between two dates, also in weeks, months and working days

Include end dateWorking days tooDates for New Delhi, checked 23 Nov 2026

Days between two dates is what the calculator above works out: choose a start date and an end date, and it gives the gap in days, then the same gap as weeks and days, months and days, and years, months and days. It also counts the working days, Monday to Friday, inside that span.

By default the start date is not counted, so 1 March to 2 March is one day. Tick "include the end date" when you need both ends, as with a leave application or a hotel booking counted in calendar days. The sections below show how the count works by hand, so you can check any figure on a notice or bill.

Two desk calendars with blank pages and an hourglass between them, for counting days between two dates
Count the gap, then decide if both ends count.

Quick facts

  • Default rule

    Start day not counted
  • Include end date

    Adds one day
  • Also shown as

    Weeks, months, years
  • Working days

    Monday to Friday
  • Days in a year

    365, or 366 in a leap year

How to calculate days between two dates by hand

  1. Count the days left in the start month after the start date.
  2. Add the full length of every month in between.
  3. Add the day number of the end date in the end month.
  4. If both ends must count, add one.

From 20 January to 10 March in a normal year: January leaves 11 days (21 to 31), February has 28, and March adds 10. The total is 49 days. Counting both ends gives 50.

To calculate the number of days between two dates without a slip, get the month lengths right, as that is the step people miss most often. Four months end on the 30th (April, June, September, November). February has 28 (29 in a leap year), and the rest have 31.

Should the first and last day count

The answer depends on what you are counting. A gap or a duration, such as how many days old a bill is, leaves out the start day. A stretch of days you are present for, such as days of leave, a hotel stay in calendar days, or a festival that runs for several days, often counts both ends.

Which count to use
You are countingUsual rule
Age of an invoice or a chequeStart day not counted
Days of leave applied forBoth days counted
Notice period servedCheck the contract wording
Visa or permit stay in a countryOften both days counted
Return or refund windowStart day not counted

If a rule is written in a contract or an official notice, follow its wording over any general habit.

Number of days between two dates, as weeks and months

Once you have the no of days between two dates, weeks are simple: divide by seven and keep whatever is left over as loose days. 100 days come to 14 weeks plus 2 days. Months are trickier, because they are not all the same length. The calculator counts whole calendar months first, from the start date to the same date in a later month, then adds the leftover days.

That is why 31 January to 28 February in a normal year shows as 28 days but also as about one month. When a contract talks of months rather than days, read it as calendar months.

Working days inside the span

The working day figure leaves out Saturdays and Sundays. It does not remove public holidays. For a count that skips central government holidays too, or one that keeps Saturday as a working day, use the working days calculator.

A rough check: five out of every seven days are weekdays, so 70 calendar days hold about 50 weekdays. The exact figure shifts by a day or two depending on which weekday you start on.

Where a days calculator between dates helps

  • Checking how many days a loan, rent or electricity bill cycle covers.
  • Counting how long you have been in a job, or how much notice remains.
  • Planning study for an exam: days left divided by chapters.
  • Finding how long a trip abroad lasted, for a visa form.
  • Counting the days to a festival or a wedding.

For a gap that starts today, the days from today counter is quicker. To go the other way, turning a start date and a number into an end date, use add days to date. For a running countdown to one day, try the countdown timer.

Leap years and long spans

Across many years, every leap day inside the span adds one to the count. Leap years are those you can split evenly by 4; for years ending in 00 the test is 400 instead. So only one century year in four keeps its 29 February.

For a span of exactly one year, the count is 365 days, or 366 when the span takes in a 29 February. The calculator handles this on its own. The leap year page explains the rule further.

Frequently asked questions

How many days are there between two dates?

Pick both dates in the calculator above and it gives the number of days. By default the start date is not counted; tick the option to include the end date if both ends should count.

How do I count days between two dates including both dates?

Work out the normal gap and add one. The calculator does this for you when you tick include the end date.

Is there a days calculator from today?

Yes. Set today as the start date here, or use the days from today counter, which starts from today on its own.

Does the calculator leave out holidays?

This one leaves out only Saturdays and Sundays in the working day figure. The working days calculator can also leave out central government holidays.

How many days between two dates in different years?

Count the remaining days of the first year, the full years between, and the days into the last year. Each 29 February inside the span adds one day.

Can I count days between dates in the past?

Yes. Any two dates work, past or future, and the order you type them in does not change the count.